GPT Shop Ltd
NHS Supplier Gate Pack

For UK companies and LLPs that supply the NHS

Your Carbon Reduction Plan for NHS tenders, in the PPN 006 format, within two working days

Built from your own energy, fuel, travel and waste figures using the 2026 UK Government conversion factors (S8). Ready for your director to approve and publish. Written to the PPN 006 standard that Evergreen Level 1 asks for.

Gate Pack £249

Full refund if we're late or it isn't usable. Terms

CRP only £149

Full refund if we're late or it isn't usable. Terms

Two working days are counted from a complete checklist. See a fictional sample plan.

GPT Shop Ltd is an independent company, not affiliated with or endorsed by NHS England, NHS Supply Chain or the Cabinet Office.

Why now

The Carbon Reduction Plan is part of the gate at tender close.

Since 6 April 2026, NHS Supply Chain asks for Evergreen Level 1 at tender close (S5). Level 1 includes a net zero by 2050 commitment, a PPN 006 Carbon Reduction Plan and UK Scope 1, 2 and relevant Scope 3 emissions.

NHS England's assessment checks four things: the plan is published, it commits to net zero by 2050 or sooner, and it gives baseline year and reporting year Scope 1, 2 and 3 figures (S4).

Some NHS Supply Chain framework notices also ask for a Modern Slavery Assessment Tool result.

What you get

Two fixed prices. One plan in the PPN 006 format.

What each option includes
IncludedCRP only
£149
Gate Pack
£249
PPN 006 Carbon Reduction Plan (Word and PDF, ready to publish)IncludedIncluded
Calculation workbook with every 2026 factor IDIncludedIncluded
Evergreen Level 1 answer sheet (criteria mapped to your evidence, plus questions 1 to 4)Not includedIncluded
MSAT readiness kit (policy, supplier code clause, questionnaire, remediation steps)Not includedIncluded
Publishing and Atamis walkthrough noteIncludedIncluded
One off fee
CRP only £149

Full refund if we're late or it isn't usable. Terms

Gate Pack £249

Full refund if we're late or it isn't usable. Terms

How it works

Four steps. You stay in charge of what is published.

  1. 01

    Pay

    Choose the Gate Pack or the plan on its own.

  2. 02

    Fill in the checklist

    About 30 to 45 minutes: energy bills, fuel or mileage, your waste contractor's report and a short staff commute survey.

  3. 03

    Get the draft plan

    Within two working days of a complete checklist.

  4. 04

    Approve and publish

    Your director approves it. You publish it on your website and complete Evergreen yourself.

Sample

See a finished plan before you buy.

FICTIONAL EXAMPLE: Hollowmere Clinical Supplies Ltd is not a real company.

The sample shows a complete Carbon Reduction Plan and the Evergreen Level 1 answer sheet for an invented NHS supplier, built with the same method and the same 2026 factors we use for you.

Read the fictional sample

What we do not do

Clear limits, so you know what you are buying.

  • We do not sign, publish or submit anything for you.
  • We do not answer the Modern Slavery Assessment Tool for you.
  • We do not guarantee a tender result or an assessment score.
  • We use only your figures. Any estimate is recorded with its method.

FAQ

Questions suppliers ask.

Do we need an audit?

No. PPN 006 does not require the plan to be verified (S3).

Is this our first footprint?

Then your reporting year becomes your baseline year, as the PPN 006 template guidance allows (S2).

Do LLPs qualify?

Yes. A designated member approves the plan.

Do you cover global emissions?

From April 2027, Evergreen asks for global Scope 1 to 3 reporting (S5). The plan covers your UK operations. When you update it for a later year, the boundary can be extended.

What if you are late, or the plan isn't usable?

Full refund if we're late or it isn't usable. Late means after two working days from a complete checklist.

Can you publish it or submit Evergreen for us?

No. Your director approves the plan, and you publish it on your website and complete Evergreen yourself. The walkthrough note shows where everything goes.

NHS Supplier Gate Pack

Get the plan ready before your next tender closes.

Gate Pack £249

Full refund if we're late or it isn't usable. Terms

CRP only £149

Full refund if we're late or it isn't usable. Terms